International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2016-09-19 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  TD (2016-09-19) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2016-09-19 to 2016-09-30

held in Switzerland [Geneva]

Other Meetings : [ 2016-09-19 ]  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:15 total items.
Temporary Documents  (WP1)  [ Source: Rapporteur Q4/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 812-WP1 ]  
 
G.fast: Draft text for new Annex to G.9701 on framing parameters for delay critical applications     Rapporteur Q4/15   Q4/15   2016-09-28
[ 807-WP1 ]  
 
G.lt: SELT for G.fast Environment     Rapporteur Q4/15   Q4/15   2016-09-26
[ 777-WP1 ]  
(Rev.1-2) 
G.fast: Updated Issues List for G.fast     Associate Rapporteur Q4/15   Q4/15   2016-09-06
[ 774-WP1 ]  
(Rev.1-2) 
Report of the Q4/15 interim activities     Rapporteur Q4/15   Q4/15   2016-09-05
[ 745-WP1 ]  
 
Report of the Q4/15 meeting     Rapporteur Q4/15   Q4/15   2016-08-30
[ 744-WP1 ]  
 
Agenda of the Q4/15 meeting     Rapporteur Q4/15   Q4/15   2016-08-30
[ 736-WP1 ]  
 
LS/o on Change to the valid range of G.997.1 managed object LSYMB     Rapporteur Q4/15   Q4/15   2016-08-10
[ 732-WP1 ]  
 
LS/o - Requirements for SELT in a G.fast Deployment Environment [to Broadband Forum]     Rapporteur Q4/15   Q4/15   2016-07-21
[ 731-WP1 ]  
 
LS/o on Determination of Amendment 1 to Recommendation ITU-T G.9700 (2014) [to ITU-R WP1A, WP6A, SG5]     Rapporteur Q4/15   Q4/15   2016-06-29
[ 730-WP1 ]  
 
LS/o on managed objects for NT software download [to BBF]     Rapporteur Q4/15   Q4/15   2016-06-29
[ 729-WP1 ]  
 
LS/o/r on ETSI liaisons on OAM for Remote Power Feed (RPF) (reply to ATTMTM6(16)000068r5; ATTMTM6(16)000035) [to BBF; ETSI TC ATTM TM6]     Rapporteur Q4/15   Q4/15   2016-06-29
[ 728-WP1 ]  
 
LS/o on facilitating CPE SELT processing based on multiple measurements of uncalibrated echo response (UER) [to BBF]     Rapporteur Q4/15   Q4/15   2016-06-29
[ 720-WP1 ]  
 
LS/r on required support of the BLACKOUT set defined within G.9701 (reply to bbf2016.560.01)     Rapporteur Q4/15   Q4/15   2016-05-03
[ 715-WP1 ]  
 
LS/o/r on SELT for G.fast (reply to bbf2016.239.00) [to BBF]     Rapporteur Q4/15   Q4/15   2016-04-13
[ 714-WP1 ]  
 
LS/o/r on trigger criteria for the FRA procedure (reply to bbf2016.306.01) [to BBF]     Rapporteur Q4/15   Q4/15   2016-04-13
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-3